March the 11th, 2023 - When it comes to Croatian bridges, it isn't just Peljesac bridge that is getting the glory. The Cetina bridge, which will finally relieve seriously irritating traffic issues in and around the Omis area, is now finally connected.
As Mladen Miletic/Poslovni Dnevnik writes, the much talked about Cetina bridge over the Cetina river canyon in Omis in Central Dalmatia was finally connected on Thursday, and it is expected that cars will be allowed to drive along it this autumn.
The brand new Cetina bridge spans 224.45 metres and is part of the wider Omis bypass construction project which seeks to help this area, known for its traffic jams and congestion issues, to relieve itself of those burdens.
It sits over the Cetina river and is held up with a steel arch, the ends of which are secured in tunnels on both sides of the bridge, meaning that its actual length is greater than the visible structure.
The value of the works on the Cetina bridge stood at around 23.16 million (without the inclusion of VAT), and this much needed project will contribute to the traffic relief of the town centre of Omis, the immediate surrounding areas and reduce overall congestion issues. The works on the new Cetina bridge were carried out by Strabag, and the designer was Veljko Prpic from the Engineering Project Institute.
Prime Minister Andrej Plenkovic said at the merger ceremony that the merger of the Cetina bridge "is a good thing for Omis, Dalmatia and Split-Dalmatia County as a whole".
For more, make sure to check out our dedicated news section.